Generator Sizing and Site Assessment

Generator Sizing and Site Assessment

Choosing the right generator system starts with assessing the facility’s power needs and the suitability of the installation site. As part of its generator sizing and site assessment service, FULL Generator reviews the devices and equipment to be used at the facility, along with the technical conditions at the proposed site.

This work helps determine the required generator capacity and assess whether the proposed location meets the generator’s operating requirements.

Determining Generator Power Requirements

During the power assessment, the facility’s total connected load is measured using suitable instruments, taking into account the devices and equipment to be used.

The assessment considers loads with high starting currents, UPS loads where present, and active and reactive loads. The findings are used to determine the right generator capacity for the facility’s needs.

Assessing the Generator Installation Site

The installation site must also be assessed to ensure it provides the conditions needed for the generator to operate properly.

The installation site must also be assessed to ensure it provides the conditions needed for the generator to operate properly.

Why Are Generator Sizing and Site Assessment Important?

Assessing power needs and installation conditions before selecting a generator helps identify the right generator capacity for the facility.

FULL Generator considers both the facility’s load characteristics and the technical conditions of the installation site to gather the information needed to select a suitable generator.

Request a generator sizing and site assessment.


0
Product Comparison