EPP North Islands Project
A 6x825 kVA synchronized generator system was installed. Multiple-generator synchronization was provided for large-scale power requirements.
A 6x825 kVA synchronized generator system was installed. Multiple-generator synchronization was provided for large-scale power requirements.
A 2x1000 kVA synchronized generator system was installed. A reliable power solution was provided for the industrial facility.
A mobilization generator system comprising 2x550, 2x1125 and 1x275 kVA units was installed. A flexible solution with different power capacities was provided.
A 2x550 kVA generator system was installed. Critical power infrastructure was provided for the data center.
A 2x1250 kVA synchronized generator system was installed. A high-capacity power solution was provided for the textile industry.
A 3x825 kVA synchronized generator system was installed. Reliable power infrastructure was provided for the housing project.
A generator system comprising 2x220, 2x500 and 1x300 kVA units was installed. Power solutions with different capacities were provided for the commercial area.
A generator system comprising 1x350 and 1x450 kVA units was installed. Power infrastructure was provided for the post-earthquake housing project.
A 2x220 kVA generator system was installed. A reliable power solution was provided for the post-earthquake housing project.
A 4x330 kVA generator system was installed. Cold-chain power infrastructure was provided for the food industry.